Happy Chinese New Year! Let's celebrate with lots of house photos!
View fullsize
On CNY Friday, I bumped into a Lion Dance in MBK.
View fullsize
It could be heard miles away. Or at least, aisles away.
View fullsize
Celebrating CNY at Cantina in Ari... haven't been here since Julia was in town.
View fullsize
The egg, lit up (and reflecting) in all its Chinese glory.
View fullsize
The newly-famous product designer, conducting a live radio interview from his "home studio".
View fullsize
Meanwhile at the house: a worker scrubs the interior of our fresh water tank.
View fullsize
All sealed up and ready to be covered. (I hope the worker got out first.)
View fullsize
They've installed the kitchen roof now.
View fullsize
The second bathroom's tiles have been scored - in preparation for the glass.
View fullsize
Sink is in place.
View fullsize
The dropped ceiling and wiring have been covered.
View fullsize
Steel railings are in.
View fullsize
Hole for the skylight.
View fullsize
Sink in the master bathroom is in.
View fullsize
Another view of the railings.
View fullsize
Kitchen roof, from inside. It's got insulation pre-installed.
View fullsize
The downstairs bathroom -- is the ceiling too low?
View fullsize
They've fixed up the downstairs ceilings.
View fullsize
And are preparing the garden floor.
View fullsize
Looking inside from the driveway.
View fullsize
Gate is about to be moved outside!
View fullsize
One of the neighbor's dogs wonders what all the fuss is about.
View fullsize
Checking out the new mini-community-mall back in Ari. A neighborhood cat hangs out at the new burger joint.
View fullsize
The new Mexican restaurant is pretty punny.
View fullsize
All the CNY zodiac signs on display at Paragon. My rat looks pretty inquisitive.
View fullsize
We bumped into a second Lion Dance - this time at Paragon.
View fullsize
House Update #2 for the week. The kitchen cabinets have been installed.
View fullsize
The bookshelf which fits into the alcove there.
View fullsize
Underneath the island. (Whoops, the cabinet comes out in anticipation of the washing machine that's no longer there.)
View fullsize
Cupboard for the washing machine - and other storage.
View fullsize
Cabinets over the hobs.
View fullsize
Downstairs sink covered in saw dust.
View fullsize
Master bathroom sink - before the wooden shelf was shortened.
View fullsize
Second bathroom - again, before the shelf was shortened.
View fullsize
The study's floor has been polished.
View fullsize
The floor in the master bedroom.
View fullsize
The floor in the second bedroom. You can see the different color of the extension.
View fullsize
The stairs are work-in-progress.
View fullsize
Stairs from below.
View fullsize
The kitchen roof has been cut-to-size.